HOMER Users Group

Official On-line Community of the HOMER Hybrid Optimization Modeling software

Information

Empower Design

A user group to talk about using Homer to model locally manufactured electricity generating devices in developing countries. This includes modeling devices which are currently not modeled in Homer Energy.

Website: http://sites.google.com/site/empowerdesign2011/
Location: US, Uganda, Liberia - currently
Members: 43
Latest Activity: Feb 24

Please consider the following when reading over our new Homer Energy models for locally manufactured devices.

http://sites.google.com/site/empowerdesign2011/

http://www.t4tafrica.com

 

Please consider the above links. The first link includes a new gap minder interactive graph. Please consider this when reading over our new Homer Energy models for locally manufactured devices.

 

 

We will be starting to  upload models and discuss the pros and cons between imported versus locally manufactured electricity generating devices in low HDI countries for hospitals, health centers, businesses, domestic use, and schools.

 

Stay tuned and we look forward to feedback.

 

Drs. Abigail Mechtenberg and Moses Musaazi

 

Discussion Forum

[URGENT]Why can't I obtain IRR, simple and discounted pay back using HOMER for my design (1MW PV gridconnected system)?‏

Hi, I am a beginner for HOMER. i am doing a final year project for my last semester in Universiti Tenaga Nasional in Malaysia. My project is about designing a 1MW solar PV plant in campus.  I was…Continue

Tags: pay, back, discounted, simple, IRR

Started by Jazreel Tang Jan 22, 2011.

Comment Wall

Comment

You need to be a member of Empower Design to add comments!

Comment by Jazreel Tang on January 22, 2011 at 10:12am
Hi, I am a beginner for HOMER.


i am doing a final year project for my last semester in Universiti Tenaga Nasional in Malaysia. My project is about designing a 1MW solar PV plant in campus.


 I was wondering why do my design could not get IRR, simple n discounted pay back where my current base is the 1MW PV system after i had simulated.

I would like to ask can HOMER calculate energy pay back period? I was confused by the simple pay back and discounted pay back it meant.
 
After i had simulated my design, Homer did not calculate the IRR, simple pay back and discounted pay back for me. I am not sure which part did i do wrongly.
 
I hope you could spare some time to help me check my design and give some opinions. The hmr file is attachedProject5.hmr.


Looking forward to your reply.



Thanks.
 
 


Regards,
Jazreel
 

Members (43)

 
 
 

© 2013   Created by Marilyn Walker.

Badges  |  Report an Issue  |  Terms of Service